    WILLISTON NORTH WATER DEPOT | North Dakota

    Project Details

    The Williston North Water Depot was a design build project that won a category B: Building/Technology Systems from the American Council of Engineering Companies. Electrical installation included earth work, concrete coordination, temporary power, primary power service feeders, site grounding, multiple standby generators, MCC & Supervisory Control, instrumentation and control wiring, SCADA, telemetry, distribution panel boards, motor and valve equipment hookups, HVAC, Fiber, emergency ballast light switching, fire alarm, and a fire suppression system. The Williston North Water Depot runs a 24-hour a day filling cycle that houses office space for their employees, garage/shop space, and a large production area for heating water.